Homepage
 

Groups
Dept. officers & representatives

Committees, meetings

Publications
Conferences

          - Reports

          - Future Conferences

Instructions & templates

 

 

Search 

 

L. Rossi Group Leader  
F. Bertinelli Deputy - Interconnection & Budget  
J. P. Koutchouk Deputy - EuCARD FP7-IA  
L. Bottura FCM Coordinator  
G. De Rijk HFM Coordinator  
L. R. Williams Security Officer  
M. Bajko Training  

C. Bosteels              (30-4/024)
R. Decreuse-Michaud (30-4/031)

M. Eslan                  (30-4/033)

 


Secretary
Secretary

Secretary Assistant
(mornings only)
 

Tel.:  0041 22 767 57 64
Tel:   0041 22 767 6952
Fax.: 0041 22 767 63 00

Tel.:  0041 22 767 86 51

Mandate

Design & construction of accelerator magnets & cryostats, development of associated superconductors

  • Design, construction and maintenance of normal conducting and superconducting magnets for CERN accelerators and beam lines
  • Design & construction of the LHC insertions
  • Design, construction and maintenance of cryostats for superconducting accelerator devices
  • Support to operation and performance of the accelerator magnet systems
  • Operation of magnet repair and maintenance facilities
  • Installation and interconnection of magnets in accelerators and beam lines
  • Development, test & analysis of superconductors
  • Consultancy & support in magnet design and superconductor performance

Organisation PDF

   s J.P. Tock CI Cryostats & Interconnections
   s F. Savary MF Magnet Repair & Assembly Facility
   s M. Karppinen ML Magnet Laboratory
   s D. Tommasini MNC Magnet Normal Conducting
   s E. Todesco MDE Magnet Design, Engineering & Analysis
   s L. Bottura SC Superconductors


MCS Secretariat web pages


Former AT-CRI + AT-MAS web pages

The CRI and MAS groups were merged 2006-09-18 into MCS. 

The former group web pages are available:

 

 

 

Last update: 2008-09-25 by PH